Skip to product information
LY-025S Curved Loveseat Blue Full Compression Sponge Sofa, 30D Chenille No-Assembly Compact Sofa for Small Spaces & Apartments, 65'L, 300 lbs, 3 Pillows
1/26

LY-025S Curved Loveseat Blue Full Compression Sponge Sofa, 30D Chenille No-Assembly Compact Sofa for Small Spaces & Apartments, 65'L, 300 lbs, 3 Pillows

Sale price  $815.70 Regular price  $883.68
Shipping calculated at checkout.
Description

Specifications

Place of Origin #originPlace#
Main Color Blue
Main Material Fabric,Foam+Spring
Product Style Casual
Seats 2 Seat
Dangerous Goods #dangerFlag#

Dimensions & Weights

Assembled Length (in.) 65.00
Assembled Width (in.) 39.40
Assembled Height (in.) 25.20
Weight (lbs) 63.63

Product Features

  • Ready-to-Use Design: Ships fully assembled—unbox and position immediately after 72-hour springback period.
  • Scratch-Resistant Fabric: Tight wood grain chenille passes 45,000+ Martindale rubs.
  • Space-Saving Dimensions: Compact 65' W x 39' D footprint fits spaces as small as 6'x6'.
  • 30-Density Compressed Foam with Spring System & Non-Slip Dot-Grip Fabric
  • Easy Maintenance: Spot-clean with mild detergent; avoid machine washing to preserve fabric integrity.

Description

Care

To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.

Design

Our dedication to excellence extends beyond materials; it encompasses the artistry and craftsmanship illustrated in every piece we create.

You may also like